Pre-inspection catches problems early so we can fix them before official inspectors arrive, preventing delays.
We verify all code requirements including clearances, connections, grounding, labeling, and proper installation techniques.
While we can't control inspector decisions, our thorough checks prevent the vast majority of potential failures.
Yes, we evaluate any installation and identify issues that need correction before official inspection.
We recommend pre-inspection at least a few days before scheduled official inspections to allow time for corrections.
Madison Electric © 2025 All Rights Reserved.